1.5 MW Solar operating in San Bernardino, CA — California Independent System Operator
1.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2015
Operating Since
Coordinates
34.5481, -117.4644
County
San Bernardino, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Clean Focus Yield, LLC | Clean Focus Yield | — |
| Owner(s) | Clean Focus Yield, LLC | — | — |
| Status | Operating | operating | — |
Coronus Adelanto West 2 is a 1.5 MW solar photovoltaic power plant located in San Bernardino County, California. The plant began operating in 2015 and has one generator. It is owned and operated by Clean Focus Yield, LLC. The plant utilizes a fixed tilt solar tracking system.
The plant's latest annual generation was 3,315 MWh, resulting in a capacity factor of 25.2%. The plant is connected to the California Independent System Operator (CAISO) balancing authority and is within the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, Coronus Adelanto West 2 ranks as the 581st largest power plant in California out of 862, and 5704th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
182 MWh
Latest Month
3.3K MWh
Annual Generation
25.2%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Adelanto Converter Station · 500 kV
Substation Distance
< 10 km
Operator
Intermountain Power Agency
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
ROADWAY 1 NO13
Pricing Hub
TH_SP15_GEN-APND
Node Source
EIA-860 direct report