1.5 MW Solar operating in Adams, CO — Southwest Power Pool
1.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2009
Operating Since
Coordinates
35.0257, -85.2082
County
Adams, CO
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Greenbacker Renewable Energy Corporation | Greenbacker Renewable Energy | — |
| Owner(s) | Greenbacker Renewable Energy Corporation | — | — |
| Status | Operating | operating | — |
Airport 1 Solar (DIA) is a 1.5 MW solar photovoltaic power plant located in Adams County, Colorado. The plant began operating in 2009 and has a single generator. It is owned and operated by Greenbacker Renewable Energy Corporation. The plant's primary fuel source is the sun, and it utilizes a fixed tilt solar tracking system.
The plant operates within the Southwest Power Pool (SPP) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, Airport 1 Solar is ranked 129th out of 177 solar plants in Colorado, and 5746th out of 7108 plants nationally. The latest annual generation data indicates an output of 2,673 MWh, resulting in a capacity factor of 20.3%.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Southwest Power Pool
Grid Voltage
0.48 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
171 MWh
Latest Month
2.7K MWh
Annual Generation
20.3%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Knutson Substation · 230 kV
Substation Distance
< 10 km
Operator
Tri-State Generation and Transmission Association
Coord Source
OSM spatial
Market Position
ISO/RTO Market
SPP
LMP Node
—
Pricing Hub
—
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.