1.5 MW Solar operating in Adams, CO — Public Service Company of Colorado
1.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
39.7522, -104.6651
County
Adams, CO
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | UXI CSG Venture 2 8302 LLC | UXI CSG Venture 2 8302 | — |
| Owner(s) | UXI CSG Venture 2 8302 LLC | — | — |
| Status | Operating | operating | — |
Venture 2 - 1B is a solar photovoltaic power plant located in Adams County, Colorado. The plant has a total capacity of 1.5 MW and consists of a single generator. It commenced operations in 2021 and is owned and operated by UXI CSG Venture 2 8302 LLC. The plant utilizes single-axis tracking technology to maximize solar energy capture.
In its most recent year of operation, Venture 2 - 1B generated 3,682 MWh of electricity, achieving a capacity factor of 27.9%. The plant operates within the Public Service Company of Colorado balancing authority and is part of the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, Venture 2 - 1B ranks as the 144th largest power plant in Colorado out of 177, and 5819th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Public Service Company of Colorado
Grid Voltage
13.2 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
178 MWh
Latest Month
3.7K MWh
Annual Generation
27.9%
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.