6.8 MW Solar operating in San Bernardino, CA — Los Angeles Department of Water and Power
6.8 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2012
Operating Since
Coordinates
34.5481, -117.4403
County
San Bernardino, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Los Angeles Department of Water & Power | Los Angeles Department of Water & Power | — |
| Owner(s) | Los Angeles Department of Water & Power | Los Angeles Department of Water & Power | — |
| Status | Operating | operating | — |
The Adelanto Solar Project is a 6.8 MW solar photovoltaic power plant located in San Bernardino County, California. The plant began operating in 2012 and utilizes a fixed-tilt solar tracking system. It is owned and operated by the Los Angeles Department of Water & Power (LADWP), which also serves as the balancing authority. The plant's primary fuel source is solar energy.
The Adelanto Solar Project operates within the Western Electricity Coordinating Council (WECC) NERC region. According to available data, the plant is ranked 262nd out of 862 solar facilities in California and 2078th nationally out of 7108 plants. Financial data indicates the plant's installed cost is known, with data sourced from Lawrence Berkeley National Laboratory (LBNL).
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Los Angeles Department of Water and Power
Grid Voltage
4.16 kV
Regulatory Status
RE
Entity Type
Municipal
Sector
Electric Utility
IVANPAH 1- EXPANSION
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
$230.8/MWh
LCOE (Levelized Cost)
$8.0/MWh
Energy Value
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.