1 MW Solar operating in Auglaize, OH — PJM Interconnection, LLC
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2022
Operating Since
Coordinates
40.3900, -84.3980
County
Auglaize, OH
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Madison Energy Investments LLC | — | — |
| Owner(s) | Madison Energy Investments LLC | — | — |
| Status | Operating | operating | — |
Minster 3 is a 1 MW solar photovoltaic power plant located in Auglaize County, Ohio. The plant began operating in 2022 and has a single generator. Madison Energy Investments LLC is the owner and operator. The plant utilizes a fixed tilt solar tracking system.
Minster 3 operates within the PJM Interconnection, LLC balancing authority, which is part of the RFC NERC region. In its latest year of operation, the plant generated 1,665 MWh of electricity, achieving a capacity factor of 19.0%. In terms of size, Minster 3 ranks as the 83rd largest solar plant in Ohio out of 84, and 6441st nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
12.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
59 MWh
Latest Month
1.7K MWh
Annual Generation
19.0%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
PJM
LMP Node
09AMSTRD69 KV BK-1
Pricing Hub
AEP-DAYTON HUB
Location Type
Load Node
Node Source
Curated node match