7 MW BESS out of service in Auglaize, OH — PJM Interconnection, LLC
7 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2016
Operating Since
Coordinates
40.3988, -84.3873
County
Auglaize, OH
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Summit Ridge Energy | — | — |
| Owner(s) | Summit Ridge Energy | — | — |
| Status | Out of service | — | — |
The HMV Minster Energy Storage System is a 7 MW battery energy storage system located in Auglaize County, Ohio. The plant began operating in 2016 and has one generator. It is owned and operated by Summit Ridge Energy. The primary fuel listed in government data is "MWH", indicating that it draws power from the grid to charge.
The facility utilizes lithium-ion batteries (LIB) and has a total storage capacity of 7 MWh, providing a duration of 1 hour at its full 7 MW output. The plant operates within the PJM Interconnection balancing authority, which is part of the RFC NERC region. The HMV Minster Energy Storage System is ranked as the 8th largest of 10 battery storage plants in Ohio, and 919th out of 1205 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
0 MWh
Net Discharge
0 MWh
Annual Net Energy
0.0%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
No financial data available for this plant.
Market Position
ISO/RTO Market
PJM
LMP Node
09AMSTRD69 KV BK-1
Pricing Hub
AEP-DAYTON HUB
Location Type
Load Node
Node Source
Curated node match