3 MW Solar operating in Auglaize, OH — PJM Interconnection, LLC
3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2015
Operating Since
Coordinates
40.3902, -84.4017
County
Auglaize, OH
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Madison Energy Holdings LLC | Madison Energy Holdings | — |
| Owner(s) | Madison Energy Holdings LLC | — | — |
| Status | Operating | operating | — |
HMW Minster PV I is a 3 MW solar photovoltaic power plant located in Auglaize County, Ohio. The plant began operating in 2015 and has one generator. Madison Energy Holdings LLC is the plant's operator. The facility utilizes fixed-tilt solar tracking technology.
The plant's primary fuel source is solar energy (SUN). In the most recent year of data, HMW Minster PV I generated 8,252 MWh of electricity, achieving a capacity factor of 31.3%. The plant operates within the PJM Interconnection, LLC balancing authority and the SERC NERC region. HMW Minster PV I is ranked as the 58th largest solar plant in Ohio out of 84, and nationally it is ranked 3803 out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
339 MWh
Latest Month
8.3K MWh
Annual Generation
31.3%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
PJM
LMP Node
09AMSTRD69 KV BK-1
Pricing Hub
AEP-DAYTON HUB
Location Type
Load Node
Node Source
Curated node match