100 MW Solar operating in Currituck, NC — PJM Interconnection, LLC
100 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
36.5044, -76.1887
County
Currituck, NC
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Leeward Asset Management, LLC | Leeward Renewable Energy | — |
| Owner(s) | Leeward Asset Management, LLC | Leeward Energy [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Leeward Energy [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Oak Trail Solar, LLC is a 100 MW solar photovoltaic power plant located in Currituck County, North Carolina. The plant began operating in 2023 and is operated by Leeward Asset Management, LLC. It utilizes single-axis tracking technology to maximize solar energy capture. The plant is interconnected to the grid within the PJM Interconnection, LLC balancing authority and the SERC NERC region.
In its most recent year of operation, Oak Trail Solar generated 234,748 MWh of electricity, achieving a capacity factor of 26.8%. The plant has a power purchase agreement (PPA) price of $31.25 per MWh, according to data from LBNL Solar. Oak Trail Solar is ranked as the 6th largest solar plant in North Carolina, out of 6 total plants, and ranks 560th nationally out of 639 solar plants.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
230 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Oak Trail Solar
10.7K MWh
Latest Month
234.7K MWh
Annual Generation
26.8%
Capacity Factor
$32.6/MWh
LCOE (Levelized Cost)
$31.3/MWh
PPA Price
$31.0/MWh
Energy Value
Market Position
ISO/RTO Market
PJM
LMP Node
PUDDNRID34.5 KV OAKTRASP
Pricing Hub
DOMINION HUB
Location Type
Generation Node
Node Source
Curated node match
Leeward Renewable Energy Completes 200MW Horizon Solar Project in Texas
Leeward Renewable Energy (LRE) has announced the successful completion and commencement of operations for its 200-megawatt (MW) Horizon Solar Project near...
Leeward Renewable Energy Completes 200MW Horizon Solar Project in Texas
Leeward Renewable Energy (LRE) has announced the successful completion and commencement of operations for its 200-megawatt (MW) Horizon Solar Project near...
Leeward completes 100 MW Oak Trail Solar project in North Carolina
Leeward Renewable Energy LLC has completed construction of its 100 MW Oak Trail Solar project near Moyock, North Carolina,
Leeward completes 100 MW Oak Trail Solar project in North Carolina
Leeward Renewable Energy LLC has completed construction of its 100 MW Oak Trail Solar project near Moyock, North Carolina,
Last updated 2026-03-26
View all 10 articlesOak Trail Solar