100 MW Solar under construction in La Paz, AZ — California Independent System Operator
100 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
—
Operating Since
Coordinates
33.5829, -113.5769
County
La Paz, AZ
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | ATLAS Solar II, LLC | — | — |
| Owner(s) | ATLAS Solar II, LLC | — | — |
| Status | Under construction | — | — |
ATLAS II is a 100 MW solar photovoltaic power plant located in La Paz County, Arizona. The plant is owned and operated by ATLAS Solar II, LLC. It utilizes fixed-tilt solar tracking technology. The plant is interconnected to the California Independent System Operator (CAISO) balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
ATLAS II is ranked as the 18th largest solar plant in Arizona out of 23, and 616th nationally out of 639. News coverage of the plant includes 4 articles about deals, 3 about industry trends, and 2 about regulatory matters.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
500 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_SP15_GEN-APND
Node Source
Plant coordinates only
Atlas Energy to buy $840M in Caterpillar power assets
Atlas Energy (AESI) has signed a $840 million deal with Caterpillar to secure power-generation equipment through 2029, as U.S. electricity...
Arizona can't afford to leave large swaths of federal land idle | Opinion
Rep. Paul Gosar and La Paz County officials are slashing the red tape that keeps needed solar energy projects from being built.
Proposed EV Manufacturing Facilities Are Being Cancelled
Over the past few years, electric vehicle (EV) manufacturing facilities producing lithium batteries and EV car parts were proposed across...
TransGrid Energy secures US$1.4 billion for two Arizona BESS totalling 450MW/1,800MWh
TransGrid Energy has successfully secured over US$1.4 billion in financing for two BESS projects located in Arizona totalling 450MW/1800MWh.
Last updated 2026-03-14
View all 10 articles