20 MW Solar operating in Currituck, NC — PJM Interconnection, LLC
20 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2015
Operating Since
Coordinates
36.4312, -76.0843
County
Currituck, NC
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Duke Energy Renewables Services | Duke Energy | — |
| Owner(s) | Fresh Air Energy X LLC | Duke Energy | — |
| Status | Operating | operating | — |
Shawboro PV1 is a 20 MW solar photovoltaic power plant located in Currituck County, North Carolina. The plant began operating in 2015 and has one generator. It is owned by Duke Energy and operated by Duke Energy Renewables Services. The plant utilizes fixed-tilt solar tracking technology and its primary fuel source is the sun. Shawboro PV1 operates within the PJM Interconnection, LLC balancing authority and the SERC NERC region.
In its latest year of reported generation, Shawboro PV1 produced 36,864 MWh of electricity, achieving a capacity factor of 21.0%. The plant is ranked 79th out of 770 power plants in North Carolina and 1542nd out of 7108 plants nationally. Financial data is available for the plant from LBNL Solar.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
34.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
2.6K MWh
Latest Month
36.9K MWh
Annual Generation
21.0%
Capacity Factor
$86.3/MWh
LCOE (Levelized Cost)
$29.8/MWh
Energy Value
Market Position
ISO/RTO Market
PJM
LMP Node
SLIGO 35 KV TX2
Pricing Hub
DOMINION HUB
Location Type
Load Node
Node Source
Curated node match
Duke Energy Progress, LLC, Duke Energy Carolinas, LLC; Notice of Application of Transfer of License and Soliciting Comments, Motions To Intervene, and Protests
Duke Energy Progress, LLC; Duke Energy Carolinas, LLC; Notice of Application of Transfer of License and Soliciting Comments, Motions To Intervene, and Protests
Duke Energy Carolinas, LLC; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions
Last updated 2026-03-25