20 MW Wind operating in Crosby, TX — Southwest Power Pool
20 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2015
Operating Since
Coordinates
33.7456, -101.4602
County
Crosby, TX
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Pleasant Hill Wind Energy LLC | Ralls | — |
| Owner(s) | Pleasant Hill Wind Energy LLC | Ralls Corp [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Ralls Corp [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
The Pleasant Hill Wind Energy Project is a 20 MW wind power plant located in Crosby County, Texas. The plant began operating in 2015 and is owned and operated by Pleasant Hill Wind Energy LLC. The facility consists of a single generator utilizing onshore wind turbine technology. Its location places it within the Southwest Power Pool (SPP) balancing authority and the Midwest Reliability Organization (MRO) NERC region.
The wind farm utilizes Sany SE9320IIIE wind turbines, characterized by a rotor diameter of 93 meters and a hub height of 80 meters. In its most recent year of operation, the plant generated 39,859 MWh of electricity, achieving a capacity factor of 22.7%. Pleasant Hill Wind Energy Project ranks as the 232nd largest power plant in Texas out of 245, and 1092nd nationally out of 1424.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Southwest Power Pool
Grid Voltage
69 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
3.3K MWh
Latest Month
39.9K MWh
Annual Generation
22.7%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
SPP
LMP Node
SPS.PLSNTHLWND
Pricing Hub
SPP South Hub
Node Source
Curated node match
Fire Weather Watch: Parmer; Castro; Swisher; Briscoe; Hall; Childress; Bailey; Lamb; Hale; Floyd; Motley; Cottle; Cochra
The Fire Weather Watch has been replaced. Please see the latest information from NWS Lubbock TX on this developing situation.
Fire Weather Watch: Parmer; Castro; Swisher; Briscoe; Hall; Childress; Bailey; Lamb; Hale; Floyd; Motley; Cottle; Cochra
Fire Weather Watch issued March 20 at 10:32PM CDT until March 22 at 9:00PM CDT by NWS Lubbock TX
Red Flag Warning: Parmer; Castro; Swisher; Briscoe; Hall; Childress; Bailey; Lamb; Hale; Floyd; Motley; Cottle; Cochra
Red Flag Warning issued March 20 at 10:32PM CDT until March 21 at 8:00PM CDT by NWS Lubbock TX
Texas Is Absolutely Rolling In New Solar Power Plants
Solar power is still alive and kicking in Texas, where a new billion-dollar, 408-megawatt solar project has just begun commercial operation.
Last updated 2026-03-21
View all 10 articles