20 MW Wind operating in Winnebago, IA — Midcontinent Independent Transmission System Operator, Inc..
20 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2008
Operating Since
Coordinates
43.3178, -93.7717
County
Winnebago, IA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Avangrid Power LLC | Avangrid Renewables | — |
| Owner(s) | Avangrid Power LLC | Avangrid | — |
| Status | Operating | operating | — |
The Winnebago Wind Power Project is a 20 MW wind farm located in Winnebago County, Iowa. The plant began operating in 2008 and is owned and operated by Avangrid Power LLC, a subsidiary of Avangrid. The facility consists of a single generator utilizing onshore wind turbine technology. It is interconnected to the Midcontinent Independent Transmission System Operator (MISO) balancing authority, within the MRO NERC region.
The wind farm's turbines have a hub height of 78 meters and a rotor diameter of 83 meters. The turbines were manufactured by Gamesa, model G83-2.0. In the most recent year of reported data, the plant generated 59,313 MWh, achieving a capacity factor of 33.8%. The Winnebago Wind Power Project ranks 81st in size among Iowa's 122 power plants and 1082nd nationally out of 1424 plants.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
69 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
5.3K MWh
Latest Month
59.3K MWh
Annual Generation
33.8%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
DPC.WINNEBAGO
Pricing Hub
MINN.HUB
Location Type
Generation Node
Node Source
Curated node match
Seeing double the solar installations in Oregon | Projects Weekly
Avangrid has energized two solar projects in Wasco County, Oregon, totaling 200 MWac. Plus, Zelestra has expanded its relationship with Meta...
Avangrid switches on 57 MW Camino Solar in California | Projects Weekly
In this edition of Projects Weekly, we highlight Avangrid's newest project in California, plus all the latest solar project news you missed.
Avangrid switches on 57 MW Camino Solar in California | Projects Weekly
In this edition of Projects Weekly, we highlight Avangrid's newest project in California, plus all the latest solar project news you missed.
Avangrid Signs Blue Creek Power Deal with American Municipal Power
Avangrid signed a short-term power purchase agreement with American Municipal Power for a portion of the energy produced from the Blue Creek...
Last updated 2026-03-26
View all 10 articles