150 MW Wind planned in Crosby, TX — Electric Reliability Council of Texas, Inc.
150 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
Planned: —
Planned Operation
Coordinates
33.7137, -101.4338
County
Crosby, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Tri Global Energy, LLC | Tri Global Energy | — |
| Owner(s) | Tri Global Energy, LLC | Tri Global Energy LLC [100%] | — |
| Status | Planned | announced | — |
GEM identifies the owner as Tri Global Energy LLC [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Crosby County Wind Farm, LLC, is a 150 MW wind power plant located in Crosby County, Texas. The facility, identified by plant ID 60273, utilizes onshore wind turbine technology and is operated by Tri Global Energy, LLC. It consists of a single generator powered by wind (WND) as its primary fuel source. The plant operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority and the TRE NERC region.
The Crosby County Wind Farm is ranked as the 162nd largest power plant in Texas out of 200 facilities and holds a national ranking of 490 out of 734 plants. The plant has been the subject of 3 news articles, with coverage focusing on industry trends and grid-related topics.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
kV
Regulatory Status
NR
Entity Type
Commercial
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_WEST
Node Source
OSM spatial match
Fire Weather Watch: Parmer; Castro; Swisher; Briscoe; Hall; Childress; Bailey; Lamb; Hale; Floyd; Motley; Cottle; Cochra
The Fire Weather Watch has been replaced. Please see the latest information from NWS Lubbock TX on this developing situation.
Fire Weather Watch: Parmer; Castro; Swisher; Briscoe; Hall; Childress; Bailey; Lamb; Hale; Floyd; Motley; Cottle; Cochra
Fire Weather Watch issued March 20 at 10:32PM CDT until March 22 at 9:00PM CDT by NWS Lubbock TX
Red Flag Warning: Parmer; Castro; Swisher; Briscoe; Hall; Childress; Bailey; Lamb; Hale; Floyd; Motley; Cottle; Cochra
Red Flag Warning issued March 20 at 10:32PM CDT until March 21 at 8:00PM CDT by NWS Lubbock TX
WattBridge Begins Commercial Operations at the 384-MW Remy Jade Facility, Its Sixth Generating Station in 4 Years
PRNewswire/ -- Independent power producer WattBridge Energy, LLC announced today commissioning of the Remy Jade Generating Station in Harris...
Last updated 2026-03-21
View all 10 articles