1.5 MW Solar operating in Los Angeles, CA — California Independent System Operator
1.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2014
Operating Since
Coordinates
34.7231, -118.2897
County
Los Angeles, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Distributed Energy | AES Distributed Energy | — |
| Owner(s) | AES Distributed Energy | — | — |
| Status | Operating | operating | — |
Summer Solar B2 is a 1.5 MW solar photovoltaic power plant located in Los Angeles County, California. The plant began operating in 2014 and has one generator. It is owned and operated by AES Distributed Energy. The plant's primary fuel source is solar energy.
In its most recent year of operation, Summer Solar B2 generated 3,035 MWh of electricity, achieving a capacity factor of 23.0%. The plant utilizes a fixed tilt solar tracking system. Summer Solar B2 operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. The plant is ranked 622 out of 862 solar plants in California, and 5828 out of 7108 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
222 MWh
Latest Month
3.0K MWh
Annual Generation
23.0%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
BSKYNGSU_2_N002
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match