1.5 MW Solar operating in Black Hawk, IA — Midcontinent Independent Transmission System Operator, Inc..
1.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2016
Operating Since
Coordinates
42.4817, -92.4580
County
Black Hawk, IA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Altus Power America Management, LLC | Altus Power America Management | — |
| Owner(s) | Altus Power America Management, LLC | — | — |
| Status | Operating | operating | — |
Cedar Falls Solar Farm is a 1.5 MW solar photovoltaic power plant located in Black Hawk County, Iowa. The plant began operating in 2016 and is owned and operated by Altus Power America Management, LLC. It utilizes a single generator and fixed-tilt solar tracking technology. The plant's primary fuel source is solar energy.
The facility operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the NERC MRO region. In its latest year of reported generation, the plant produced 2,430 MWh of electricity, achieving a capacity factor of 18.5%. Cedar Falls Solar Farm ranks as the 24th largest solar plant in Iowa out of 31, and 5728th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
480 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
88 MWh
Latest Month
2.4K MWh
Annual Generation
18.5%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
MEC.CFU_1.AZ
Pricing Hub
MINN.HUB
Location Type
Trading Hub
Node Source
Curated node match