1 MW Solar operating in Los Angeles, CA — California Independent System Operator
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2014
Operating Since
Coordinates
34.7231, -118.2897
County
Los Angeles, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Distributed Energy | AES Distributed Energy | — |
| Owner(s) | AES Distributed Energy | — | — |
| Status | Operating | operating | — |
Summer Solar D2 is a 1 MW solar photovoltaic power plant located in Los Angeles County, California. The plant began operating in 2014 and has one generator. It is owned and operated by AES Distributed Energy. The plant utilizes fixed-tilt solar tracking technology.
In its most recent year of operation, Summer Solar D2 generated 1,822 MWh of electricity, achieving a capacity factor of 20.7%. The plant is connected to the California Independent System Operator (CAISO) balancing authority and operates within the Western Electricity Coordinating Council (WECC) NERC region. Summer Solar D2 ranks as the 760th largest solar plant in California out of 862, and 6307th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
62 MWh
Latest Month
1.8K MWh
Annual Generation
20.7%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
BSKYNGSU_2_N002
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match