4 MW Solar operating in Mercer, OH — PJM Interconnection, LLC
4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2012
Operating Since
Coordinates
40.5422, -84.5928
County
Mercer, OH
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Celina Solar Project #1, LLC | Celina Solar Project #1 | — |
| Owner(s) | Celina Solar Project #1, LLC | — | — |
| Status | Operating | operating | — |
The Celina Solar Project #1, LLC is a 4 MW solar photovoltaic power plant located in Mercer County, Ohio. The plant began operating in 2012 and is owned and operated by Celina Solar Project #1, LLC. It consists of a single generator utilizing fixed-tilt solar tracking technology.
The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. In the most recent year of data, the plant generated 6,454 MWh of electricity, achieving a capacity factor of 18.4%. Celina Solar Project #1, LLC ranks as the 51st largest solar plant in Ohio out of 84, and 3531st nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
69 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
228 MWh
Latest Month
6.5K MWh
Annual Generation
18.4%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
PJM
LMP Node
CELINA 69 KV CEL 1
Pricing Hub
AEP-DAYTON HUB
Location Type
Load Node
Node Source