9.9 MW BESS operating in Brooks, TX — Electric Reliability Council of Texas, Inc.
9.9 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2024
Operating Since
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | HEN Infrastructure, L.L.C. | Hunt Energy Network | — |
| Owner(s) | Hunt Energy Network, LLC, John Hancock Funding Company, Manulife Infrastructure II Holdings A, L.P. | Hunt Energy | — |
| Status | Operating | — | — |
Falfurrias BESS is a battery energy storage system located in Brooks County, Texas. The plant, which began operating in 2024, has a total capacity of 9.9 MW and utilizes batteries as its primary fuel source, specifically lithium-ion batteries (LIB). It consists of a single generator. The facility is owned by Hunt Energy and operated by HEN Infrastructure, L.L.C.
The battery system has a storage capacity of 9.9 MWh, providing a duration of 1 hour at full output. Falfurrias BESS operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority and the TRE NERC region. In terms of size, the plant ranks 309 out of 313 facilities in Texas and 848 out of 1205 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Falfur BESS
−21 MWh
Net Charging
-112 MWh
Annual Net Energy
-0.1%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Falfurrias Substation · 138 kV
Substation Distance
0 km
Operator
American Electric Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
FALFUR_RN2
Pricing Hub
HB_SOUTH
Secondary Zone
LZ_SOUTH
Location Type
Resource Node
Node Source
Curated node match