9.9 MW BESS operating in Starr, TX — Electric Reliability Council of Texas, Inc.
9.9 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2025
Operating Since
Coordinates
26.3928, -98.8194
County
Starr, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Prologis Logistics Services Incorporated BESS | — | — |
| Owner(s) | Prologis Logistics Services Incorporated BESS | — | — |
| Status | Operating | — | — |
Rio Grande City BESS 2 is a 9.9 MW battery energy storage system located in Starr County, Texas. The facility, which began operating in 2025, has one generator and is owned and operated by Prologis Logistics Services Incorporated BESS. The plant utilizes batteries as its primary fuel source, designated as MWH in the data.
The facility operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region. Rio Grande City BESS 2 has a storage duration of approximately 2.49 hours. In terms of size, the plant is ranked 297th out of 313 facilities in Texas and 829th out of 1205 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Rio Grande City BESS 2
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Rio Grande City Substation · 138 kV
Substation Distance
< 10 km
Operator
American Electric Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_SOUTH
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.