100 MW Solar planned in Freestone, TX — Electric Reliability Council of Texas, Inc.
100 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Coordinates
31.8706, -96.1525
County
Freestone, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Freestone Solar LLC | — | — |
| Owner(s) | Freestone Solar LLC | — | — |
| Status | Planned | announced | — |
Timber Cove Solar is a 100 MW solar photovoltaic power plant located in Freestone County, Texas. The plant is owned and operated by Freestone Solar LLC. It consists of a single generator utilizing fixed-tilt solar tracking technology. The plant's primary fuel source is solar energy.
Timber Cove Solar operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, which is part of the Texas Reliability Entity (TRE) NERC region. According to state rankings, Timber Cove Solar is the 190th largest power plant in Texas out of 192 plants. Nationally, it is ranked 571st out of 639 plants.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Timber Cove Solar SLF
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Richland Chambers Substation · 345 kV
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.