9.9 MW BESS operating in Collin, TX — Electric Reliability Council of Texas, Inc.
9.9 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2025
Operating Since
Coordinates
33.1570, -96.4026
County
Collin, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SBESS TX7 LLC | — | — |
| Owner(s) | Adapture Solar Investments 6, LLC | — | — |
| Status | Operating | — | — |
Farmersville West is a 9.9 MW battery energy storage system (BESS) located in Collin County, Texas. The plant began operating in 2025 and has one generator. It is owned and operated by SBESS TX7 LLC. The facility is connected to the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority.
The plant utilizes batteries as its primary fuel source, storing and discharging electricity. The BESS has a duration of 2.49 hours, meaning it can discharge its full 9.9 MW capacity for approximately two and a half hours. Farmersville West ranks 270th out of 313 power plants in Texas and 809th nationally out of 1205 plants. The plant resides within the Texas Reliability Entity (TRE) NERC region.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
22 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Farmersville West BESS 2
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match