200 MW Solar operating in Kent, TX — Electric Reliability Council of Texas, Inc.
200 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Texas Solar Nova 2, LLC | Clearway Energy Group LLC [50%] | — |
| Owner(s) | Texas Solar Nova 2, LLC | Clearway Energy | — |
| Status | Operating | operating | — |
Texas Solar Nova 2 is a 200 MW solar photovoltaic power plant located in Kent County, Texas. The plant, which began operating in 2024, utilizes single-axis tracking technology. It is owned by Clearway Energy and operated by Texas Solar Nova 2, LLC. The plant is interconnected to the Electric Reliability Council of Texas (ERCOT) grid, within the TRE NERC region.
The facility's latest annual generation was 562,730 MWh, resulting in a capacity factor of 32.1%. Texas Solar Nova 2 ranks as the 107th largest solar plant in Texas out of 192, and 206th nationally out of 639. Financial data is available for the plant, sourced from LBNL Solar.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Texas Solar Nova 2
33.7K MWh
Latest Month
562.7K MWh
Annual Generation
32.1%
Capacity Factor
$31.6/MWh
LCOE (Levelized Cost)
Market Position
ISO/RTO Market
ERCOT
LMP Node
NOVA1SLR_ALL
Pricing Hub
HB_WEST
Secondary Zone
LZ_WEST
Location Type
Resource Node
Node Source
Curated node match
Fire Weather Watch: Parmer; Castro; Swisher; Briscoe; Hall; Childress; Bailey; Lamb; Hale; Floyd; Motley; Cottle; Cochra
The Fire Weather Watch has been replaced. Please see the latest information from NWS Lubbock TX on this developing situation.
Red Flag Warning: Parmer; Castro; Swisher; Briscoe; Hall; Childress; Bailey; Lamb; Hale; Floyd; Motley; Cottle; Cochra
Red Flag Warning issued March 20 at 10:32PM CDT until March 21 at 8:00PM CDT by NWS Lubbock TX
Fire Weather Watch: Parmer; Castro; Swisher; Briscoe; Hall; Childress; Bailey; Lamb; Hale; Floyd; Motley; Cottle; Cochra
Fire Weather Watch issued March 20 at 10:32PM CDT until March 22 at 9:00PM CDT by NWS Lubbock TX
Clearway Energy, Inc. Reports Full Year 2025 Financial Results
Achieved 2025 financial results at the top end of the original guidance range Fleet Enhancement program advanced with repowerings for...
Last updated 2026-03-21
View all 10 articlesTEXAS SOLAR NOVA 3