1488.5 MW Sub. Coal operating in Bexar, TX — Electric Reliability Council of Texas, Inc.
1,488.5 MW
Nameplate Capacity
2
Generators
units
Conventional Steam Coal
Technology
1992
Operating Since
Coordinates
29.3097, -98.3203
County
Bexar, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of San Antonio - (TX) | — | — |
| Owner(s) | City of San Antonio - (TX) | — | — |
| Status | Operating | — | — |
The J K Spruce power plant, located in Bexar County, Texas, has a total capacity of 1488.5 MW across two generators utilizing conventional steam coal technology. The plant's primary fuel source is subbituminous coal. It began operating in 1992 and is owned and operated by the City of San Antonio.
In the most recent year of data, the plant generated 6,462,273 MWh, achieving a capacity factor of 49.5%. J K Spruce operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region. Among coal plants in Texas, it ranks as the 4th largest out of 8, and nationally it is the 22nd largest out of 75.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
345 kV
Regulatory Status
RE
Entity Type
Municipal
Sector
Electric Utility
418.2K MWh
Latest Month
6.5M MWh
Annual Generation
49.5%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
J. K. Spruce Switchyard · 345 kV
Substation Distance
< 10 km
Operator
CPS Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
CALAVER_JKS2
Pricing Hub
HB_SOUTH
Secondary Zone
LZ_SOUTH
Location Type
Resource Node
Node Source
EIA-860 direct report
After Winter Storm Uri, energy storage tech is making Texas more resilient
Energy storage is an insurance policy for a fast-growing state that demands affordable power and expects the lights to stay on in extreme...
After Winter Storm Uri, energy storage tech is making Texas more resilient
Energy storage is an insurance policy for a fast-growing state that demands affordable power and expects the lights to stay on in extreme...
2021 winter storm exposed grid weakness; part of Texas’ solution is being built near S.A.
Smokestacks from CPS Energy's J.K. Spruce Power Station rise in the distance behind Eolian's Padua 2 battery storage facility currently...
2021 winter storm exposed grid weakness; part of Texas’ solution is being built near S.A.
Smokestacks from CPS Energy's J.K. Spruce Power Station rise in the distance behind Eolian's Padua 2 battery storage facility currently...
Last updated 2026-03-14
View all 10 articles