200 MW BESS under construction in Bexar, TX — Electric Reliability Council of Texas, Inc.
200 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
—
Operating Since
Coordinates
29.3251, -98.3256
County
Bexar, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Padua 3 | — | — |
| Owner(s) | Padua 3 | — | — |
| Status | Under construction | — | — |
Padua 3 is a 200 MW battery energy storage system located in Bexar County, Texas. The plant, identified by the EIA plant code 68914, is owned and operated by Padua 3. It consists of a single generator utilizing batteries as its primary technology and MWH as its fuel source.
The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region. Padua 3 is ranked as the 116th largest power plant in Texas out of 224, and nationally it holds a rank of 296 out of 514 facilities. News coverage related to the plant includes 6 articles about deals, 1 about the grid, and 1 about the industry.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
ERCOT
LMP Node
RN_PAD3_ESS
Pricing Hub
HB_SOUTH
Node Source
Curated node match
Steve Hudspeth (opinion): What do battery farms mean for us in CT?
The electric grid that carries our electric power from generators to users has been called the most complicated machine ever created,...
2021 winter storm exposed grid weakness; part of Texas’ solution is being built near S.A.
Smokestacks from CPS Energy's J.K. Spruce Power Station rise in the distance behind Eolian's Padua 2 battery storage facility currently...
2021 winter storm exposed grid weakness; part of Texas’ solution is being built near S.A.
Smokestacks from CPS Energy's J.K. Spruce Power Station rise in the distance behind Eolian's Padua 2 battery storage facility currently...
2021 winter storm exposed grid weakness; part of Texas’ solution is being built near S.A.
Smokestacks from CPS Energy's J.K. Spruce Power Station rise in the distance behind Eolian's Padua 2 battery storage facility currently...
Last updated 2026-03-26