2.9 MW Solar operating in Kern, CA — California Independent System Operator
2.9 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2020
Operating Since
Coordinates
35.4998, -119.1453
County
Kern, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | JKB Energy | — | — |
| Owner(s) | Sun Pacific Shippers LP | — | — |
| Status | Operating | operating | — |
Sun Pacific - Lerdo is a 2.9 MW solar photovoltaic power plant located in Kern County, California. The plant began operating in 2020 and has one generator. It is owned and operated by JKB Energy. The plant uses single-axis tracking to maximize solar energy capture.
The plant's location within California places it in the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Sun Pacific - Lerdo ranks as the 436th largest solar plant in California out of 862, and 4117th nationally out of 7108. The plant's primary fuel source is the sun.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
480 kV
Regulatory Status
NR
Entity Type
Industrial
Sector
Industrial Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Lerdo Sub
Substation Distance
0.597 km
Operator
Pacific Gas and Electric Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
LERDO_1_N001
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match