2.9 MW Solar operating in Sacramento, CA — Balancing Authority of Northern California
2.9 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2011
Operating Since
Coordinates
38.2378, -121.3381
County
Sacramento, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Sacramento PV Energy, LLC | Sacramento PV Energy | — |
| Owner(s) | Sacramento PV Energy, LLC | — | — |
| Status | Operating | operating | — |
SMUD at Fleshman is a 2.9 MW solar photovoltaic power plant located in Sacramento County, California. The plant began operating in 2011 and is owned and operated by Sacramento PV Energy, LLC. It consists of a single generator utilizing fixed-tilt solar tracking technology. The plant's primary fuel source is solar energy.
The plant operates within the Balancing Authority of Northern California (BANC) and the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, SMUD at Fleshman is ranked 430th out of 862 solar plants in California, and 4082nd nationally out of 7108 plants. The plant's latest annual generation was 4,963 MWh, resulting in a capacity factor of 19.5%.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Balancing Authority of Northern California
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
175 MWh
Latest Month
5.0K MWh
Annual Generation
19.5%
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.