214.3 MW Wind under construction in Page, IA — Midcontinent Independent Transmission System Operator, Inc..
214.3 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
—
Operating Since
Coordinates
40.6341, -95.3707
County
Page, IA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | MidAmerican Energy Co | MidAmerican Energy Co | — |
| Owner(s) | MidAmerican Energy Co | Berkshire Hathaway | — |
| Status | Under construction | construction | — |
Shenandoah Hills Wind Farm is a 214.3 MW wind power facility located in Page County, Iowa. The plant, identified by plant ID 68872, utilizes onshore wind turbine technology and consists of a single generator. The primary fuel source is wind (WND). It is owned by Berkshire Hathaway and operated by MidAmerican Energy Co.
The plant operates within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and the MRO NERC region. Shenandoah Hills Wind Farm holds a notable position as the 17th largest wind farm in Iowa out of 54, and ranks 228th nationally among 734 wind farms.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
345 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
22.8K MWh
Latest Month
—
Annual Generation
—
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match
Red Flag Warning: Monona; Harrison; Shelby; Pottawattamie; Mills; Montgomery; Fremont; Page; Knox; Cedar; Thurston; An