180 MW BESS planned in Brazoria, TX — Electric Reliability Council of Texas, Inc.
180 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
Planned: —
Planned Operation
Coordinates
29.1504, -95.6212
County
Brazoria, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Nexus Renewables U.S. Inc. | — | — |
| Owner(s) | Nexus Renewables U.S. Inc. | — | — |
| Status | Planned | — | — |
Brazos River BESS LLC is a battery energy storage system located in Brazoria County, Texas. The plant has a total capacity of 180 MW and consists of a single generator. The primary fuel source is electricity (MWH), indicating that it charges from the grid. Nexus Renewables U.S. Inc. operates the facility.
The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, which is part of the Texas Reliability Entity (TRE) NERC region. Brazos River BESS LLC ranks as the 140th largest power plant in Texas out of 224, and 342nd nationally out of 514 plants.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
West Columbia Local Substation · 138 kV
Substation Distance
2.871 km
Operator
Texas-New Mexico Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
CAST_ESS_RN
Pricing Hub
HB_HOUSTON
Secondary Zone
LZ_HOUSTON
Location Type
Resource Node
Node Source
Curated node match