50 MW BESS operating in Brazoria, TX — Electric Reliability Council of Texas, Inc.
50 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2022
Operating Since
Coordinates
29.1592, -95.6617
County
Brazoria, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Key Capture Energy | — | — |
| Owner(s) | Key Capture Energy | — | — |
| Status | Operating | — | — |
TX23 Roughneck Storage is a 50 MW battery energy storage system located in Brazoria County, Texas. The plant began operating in 2022 and has a single generator utilizing lithium-ion battery (LIB) chemistry. The facility is owned and operated by Key Capture Energy. As a storage facility, its primary fuel is listed as "MWH" (megawatt-hours).
The plant has 50 MWh of total energy storage capacity, providing a duration of 1 hour at its full 50 MW output. TX23 Roughneck Storage operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, and is within the TRE NERC region. In terms of capacity, the plant is ranked 231st out of 313 power plants in Texas, and 618th out of 1205 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
−373 MWh
Net Charging
-4.3K MWh
Annual Net Energy
-1.0%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
West Columbia Substation · 138 kV
Substation Distance
0 km
Operator
CenterPoint Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
NCO_RN
Pricing Hub
HB_HOUSTON
Secondary Zone
LZ_HOUSTON
Location Type
Resource Node
Node Source
Curated node match
West Michigan residents rally against controversial ‘Project BESS’ battery facility
A company called Key Capture Energy is proposing to build a 100-megawatt battery energy storage complex in Ottawa County.
5 takeaways from Ottawa County’s 100-megawatt battery storage project
New York-based energy storage company Key Capture Energy is in the early stages of planning a battery storage facility in Blendon Township...
5 takeaways from Ottawa County’s 100-megawatt battery storage project
New York-based energy storage company Key Capture Energy is in the early stages of planning a battery storage facility in Blendon Township...
Key Capture Energy completes ITC transfer and construction on two 100MW Texas BESS projects
US battery storage developer Key Capture Energy (KCE) has begun commercial operations for two 100MW battery energy storage system (BESS) projects in Texas.
Last updated 2026-03-26
View all 10 articles