| Operator | Red River Clean Energy | — | — |
| Owner(s) | Red River Clean Energy | — | — |
| Status | Planned | pre-construction | — |
Uva Creek Solar is a 301 MW solar photovoltaic power plant located in Borden County, Texas. The plant's primary fuel source is the sun, and it utilizes fixed-tilt solar tracking technology. It consists of a single generator. Red River Clean Energy operates the facility.
Uva Creek Solar ranks as the 40th largest solar plant in Texas out of 192, and 72nd nationally out of 639. The plant is located within the Electric Reliability Council of Texas (ERCOT) balancing authority, and the North American Electric Reliability Corporation (NERC) region TRE.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
345 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Gail Substation · 138 kV
Substation Distance
< 10 km
Operator
Oncor
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_WEST
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
Fire Weather Watch: Sacramento Foothills and Guadalupe Mountains; Chaves County Plains; Eddy Plains; Lea; Gaines; Dawson
Fire Weather Watch issued March 21 at 2:43AM CDT until March 23 at 12:00AM CDT by NWS Midland/Odessa TX
Fire Weather Watch: Sacramento Foothills and Guadalupe Mountains; Chaves County Plains; Eddy Plains; Lea; Gaines; Dawson
Fire Weather Watch issued March 21 at 2:43AM CDT until March 23 at 12:00AM CDT by NWS Midland/Odessa TX
Bechtel Will Build Major Solar and Storage Project in Texas
Global engineering and construction group Bechtel said it will work with Doral Renewables to design and build a 430-MW solar power station...
Last updated 2026-03-21
View all articles