305.6 MW Solar operating in Borden, TX — Electric Reliability Council of Texas, Inc.
305.6 MW
Nameplate Capacity
2
Generators
units
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
32.7729, -101.3910
County
Borden, TX
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SE Juno, LLC | SOLV Energy | — |
| Owner(s) | SE Juno, LLC | Toyota Tsusho | — |
| Status | Operating | operating | — |
The Juno Solar Project is a 305.6 MW solar photovoltaic power plant located in Borden County, Texas. The plant began operating in 2021 and is owned by Toyota Tsusho, a Japanese corporation. SE Juno, LLC is the listed operator with the Energy Information Administration (EIA). The facility utilizes single-axis tracking technology to maximize solar energy capture. It connects to the Electric Reliability Council of Texas, Inc. (ERCOT) grid, operating within the TRE NERC region.
In its most recent year of operation, the Juno Solar Project generated 766,600 MWh of electricity, achieving a capacity factor of 28.6%. The plant is ranked as the 39th largest solar facility in Texas out of 192, and 71st nationally out of 639. Financial data indicates the plant's installed cost and PPA price are tracked by Lawrence Berkeley National Laboratory (LBNL).
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
42.2K MWh
Latest Month
766.6K MWh
Annual Generation
28.6%
Capacity Factor
$43.2/MWh
LCOE (Levelized Cost)
$22.9/MWh
Energy Value
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_WEST
Node Source
Plant coordinates only
Fire Weather Watch: Sacramento Foothills and Guadalupe Mountains; Chaves County Plains; Eddy Plains; Lea; Gaines; Dawson
Fire Weather Watch issued March 21 at 2:43AM CDT until March 23 at 12:00AM CDT by NWS Midland/Odessa TX
Fire Weather Watch: Sacramento Foothills and Guadalupe Mountains; Chaves County Plains; Eddy Plains; Lea; Gaines; Dawson
Fire Weather Watch issued March 21 at 2:43AM CDT until March 23 at 12:00AM CDT by NWS Midland/Odessa TX
Avantus, Toyota Group Complete Construction of Texas Solar Power Project
U.S.-based clean energy group Avantus, along with Toyota Tsusho America (TAI), announced completion of the 159-MW Norton Solar Project in Runnels County, Texas. The companies on March 18 said TAI has entered into a long-term virtual power purchase agreement with Toyota Motor North America for the...
Avantus, Toyota Group Complete Construction of Texas Solar Power Project
U.S.-based clean energy group Avantus, along with Toyota Tsusho America (TAI), announced completion of the 159-MW Norton Solar Project in Runnels County, Texas. The companies on March 18 said TAI has entered into a long-term virtual power purchase agreement with Toyota Motor North America for the...
Last updated 2026-03-21
View all 5 articles