1.6 MW Natural Gas operating in Bell, TX — Electric Reliability Council of Texas, Inc.
1.6 MW
Nameplate Capacity
4
Generators
units
Natural Gas Internal Combustion Engine
Technology
2024
Operating Since
Coordinates
31.1524, -97.3612
County
Bell, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Texas Microgrid, LLC | — | — |
| Owner(s) | Texas Microgrid, LLC | — | — |
| Status | Operating | — | — |
HEBTEMDistCenter1B is a natural gas-fired power plant located in Bell County, Texas. The plant has a total capacity of 1.6 MW and consists of 4 generators utilizing natural gas internal combustion engine technology. It began operating in 2024 and is owned and operated by Texas Microgrid, LLC.
The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority. In terms of size, HEBTEMDistCenter1B ranks as the 190th largest power plant in Texas out of 312 plants, and 1759th nationally out of 1963 plants. The plant is within the TRE NERC region.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
160 MWh
Latest Month
—
Annual Generation
—
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_SOUTH
Node Source
OSM spatial match