4.8 MW Natural Gas operating in Bell, TX — Electric Reliability Council of Texas, Inc.
4.8 MW
Nameplate Capacity
12
Generators
units
Natural Gas Internal Combustion Engine
Technology
2023
Operating Since
Coordinates
31.1524, -97.3612
County
Bell, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Texas Microgrid, LLC | — | — |
| Owner(s) | Texas Microgrid, LLC | — | — |
| Status | Operating | — | — |
The HEBTEMDistCenter is a natural gas-fired power plant located in Bell County, Texas. The plant has a total capacity of 4.8 MW, distributed across 12 generators utilizing natural gas internal combustion engine technology. It is owned and operated by Texas Microgrid, LLC. The plant began operating in 2023.
The HEBTEMDistCenter operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, falling under the Texas Reliability Entity (TRE) NERC region. In its most recent year of operation, the plant generated 618 MWh of electricity, achieving a capacity factor of 1.5%. The plant ranks 179th out of 312 power plants in Texas and 1594th out of 1963 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
45 MWh
Latest Month
618 MWh
Annual Generation
1.5%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_SOUTH
Node Source
OSM spatial match