1 MW Solar operating in Seward, NE — Southwest Power Pool
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
40.8288, -97.0784
County
Seward, NE
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Today's Power, Inc. | Today's Power, Inc. | — |
| Owner(s) | Today's Power, Inc. | Today's Power, Inc. | — |
| Status | Operating | operating | — |
GEM identifies the owner as Today's Power, Inc.
This entity is not yet in the GEM ownership database — chain unavailable.
Ruby-Norris is a 1 MW solar photovoltaic power plant located in Seward County, Nebraska. The plant began operating in 2023 and is owned and operated by Today's Power, Inc. It consists of a single generator utilizing single-axis tracking technology to maximize solar energy capture. The plant is interconnected to the Southwest Power Pool (SPP) grid, within the Midcontinent Reliability Organization (MRO) NERC region.
In its latest year of operation, Ruby-Norris generated 2,400 MWh of electricity, achieving a capacity factor of 27.3%. The plant ranks 15th out of 18 solar facilities in Nebraska and 6931st nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Southwest Power Pool
Grid Voltage
12.47 kV
Regulatory Status
RE
Entity Type
Cooperative
Sector
Electric Utility
93 MWh
Latest Month
2.4K MWh
Annual Generation
27.3%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
SPP
LMP Node
—
Pricing Hub
SPP North Hub
Node Source
OSM spatial match
Red Flag Warning: Monona; Harrison; Shelby; Pottawattamie; Mills; Montgomery; Fremont; Page; Knox; Cedar; Thurston; An
Red Flag Warning issued March 21 at 1:04PM CDT until March 22 at 4:00AM CDT by NWS Omaha/Valley NE
Last updated 2026-03-21
View all articles