4 MW Solar operating in Lancaster, NE — Southwest Power Pool
4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2016
Operating Since
Coordinates
40.8253, -96.8172
County
Lancaster, NE
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Adapture Renewables, Inc. | Adapture Renewables, Inc. | — |
| Owner(s) | Adapture Renewables, Inc. | — | — |
| Status | Operating | operating | — |
Holdrege Solar Center is a 4 MW solar photovoltaic power plant located in Lancaster County, Nebraska. The plant began operating in 2016 and has one generator. Adapture Renewables, Inc. is the plant's operator. The facility utilizes single-axis tracking to maximize solar energy capture. Holdrege Solar Center ranks as the 7th largest solar plant in Nebraska out of 18, and 3464th nationally out of 7108.
The plant's latest annual generation was 6,083 MWh, resulting in a capacity factor of 17.4%. Holdrege Solar Center operates within the Southwest Power Pool (SPP) balancing authority and the Midwest Reliability Organization (MRO) NERC region.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Southwest Power Pool
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
216 MWh
Latest Month
6.1K MWh
Annual Generation
17.4%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Northwest 68th & West Holdrege · 345 kV
Substation Distance
< 10 km
Operator
Lincoln Electric System
Coord Source
OSM spatial
Market Position
ISO/RTO Market
SPP
LMP Node
—
Pricing Hub
SPP North Hub
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
Red Flag Warning: Monona; Harrison; Shelby; Pottawattamie; Mills; Montgomery; Fremont; Page; Knox; Cedar; Thurston; An
Red Flag Warning issued March 21 at 1:04PM CDT until March 22 at 4:00AM CDT by NWS Omaha/Valley NE
Last updated 2026-03-21
View all articles