250 MW Solar planned in Hardeman, TX — Electric Reliability Council of Texas, Inc.
250 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Coordinates
34.2655, -99.8721
County
Hardeman, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Lazy U Solar 2 LLC | — | — |
| Owner(s) | Lazy U Solar 2 LLC | — | — |
| Status | Planned | announced | — |
Lazy U Solar 2 is a 250 MW solar photovoltaic power plant located in Hardeman County, Texas. The plant is owned and operated by Lazy U Solar 2 LLC. It utilizes a fixed tilt solar tracking system. As of the latest rankings, Lazy U Solar 2 is the 54th largest solar plant in Texas out of 192, and the 128th largest in the United States out of 639. The plant has one generator.
The plant operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority, and the NERC TRE regional entity. The primary fuel source for electricity generation is solar energy (SUN).
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
345 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Lazy U Solar 2ERCOT-26INR0172
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Quanah Acme Mills Substation · 69 kV
Substation Distance
< 10 km
Operator
American Electric Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.