250 MW Solar planned in Callaway, MO — Midcontinent Independent Transmission System Operator, Inc..
250 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Coordinates
38.9587, -91.9448
County
Callaway, MO
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Show Me State Solar, LLC | — | — |
| Owner(s) | Show Me State Solar, LLC | — | — |
| Status | Planned | pre-construction | — |
Show Me State Solar is a 250 MW solar photovoltaic power plant located in Callaway County, Missouri. The plant, owned and operated by Show Me State Solar, LLC, utilizes fixed-tilt solar tracking technology. It ranks as the third-largest solar plant in Missouri out of seven plants, and 124th nationally out of 639 solar plants. The plant's primary fuel source is solar energy (SUN).
The plant operates within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and the Southeastern Electric Reliability Council (SERC) NERC region. The facility consists of one generator.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
345 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
ILLINOIS.HUB
Node Source
OSM spatial match
DESRI and Ranger Power Secure Financing for 290 MW Solar Projects
DESRI, an owner and operator of renewable energy projects in North America, in partnership with Ranger Power, a utility-scale clean...
Project Finance Brief: DESRI, Ranger Power Secure Financing for 250 MW Solar Project
From: Mercom Capital Group DESRI, a renewable energy project developer, in partnership with Ranger Power, a utility-scale clean power...
Aura Power Secures $41 Million Financing for a Solar Project in UK
Aura Power, a solar and energy storage project developer, secured £33.1 million (~$41.1 million) project financing to develop and...
DESRI, Ranger Power start construction of 250MWac solar project
DESRI, in collaboration with Ranger Power, has announced the commencement of construction for the Show Me State solar project.
Last updated 2026-03-14
View all 7 articles