401.4 MW Solar under construction in Eastland, TX — Electric Reliability Council of Texas, Inc.
401.4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
—
Operating Since
Coordinates
32.4382, -99.1577
County
Eastland, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Sequoia 1 Solar Project | — | — |
| Owner(s) | Sequoia 1 Solar Project | — | — |
| Status | Under construction | construction | — |
Sequoia 1 is a 401.4 MW solar photovoltaic power plant located in Eastland County, Texas. The plant, identified by the EIA plant code 68200, is owned and operated by Sequoia 1 Solar Project. It utilizes fixed-tilt solar tracking technology. The facility consists of a single generator and is fueled by solar energy.
Sequoia 1 operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region. It ranks as the 20th largest solar plant in Texas out of 192, and nationally it holds the 39th position among 639 solar facilities.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
345 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
21.1K MWh
Latest Month
—
Annual Generation
—
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
ERCOT
LMP Node
DORA_SLR_RN
Pricing Hub
HB_NORTH
Secondary Zone
LZ_NORTH
Location Type
Resource Node
Node Source
Curated node match