214 MW Solar planned in Milam, TX — Electric Reliability Council of Texas, Inc.
214 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Coordinates
30.8685, -96.7357
County
Milam, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Two Rivers Solar, LLC | — | — |
| Owner(s) | Two Rivers Solar, LLC | — | — |
| Status | Planned | announced | — |
Two Rivers Solar is a 214 MW solar photovoltaic power plant located in Milam County, Texas. The plant, identified by the EIA plant code 68198, is owned and operated by Two Rivers Solar, LLC. It utilizes fixed-tilt solar tracking technology. The plant ranks 87th in size among Texas power plants and 185th nationally, out of 192 and 639 plants respectively.
The plant consists of a single generator and operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, which falls under the Texas Reliability Entity (TRE) NERC region. The primary fuel source for the plant is solar energy. News coverage of the plant includes 9 articles, with topics including industry trends, grid operations, business deals, and regulatory matters.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Two Rivers SolarERCOT-24INR0099
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Branchville Substation · 69 kV
Substation Distance
< 10 km
Operator
Brazos Electric
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_SOUTH
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
Last updated 2026-03-26
View all 7 articles