50 MW BESS operating in Robertson, TX — Electric Reliability Council of Texas, Inc.
50 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2022
Operating Since
Coordinates
30.8814, -96.6252
County
Robertson, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Key Capture Energy | — | — |
| Owner(s) | Key Capture Energy | — | — |
| Status | Operating | — | — |
TX11 Republic Road Storage is a 50 MW battery energy storage system located in Robertson County, Texas. The plant began operating in 2022 and is owned and operated by Key Capture Energy. It consists of a single generator utilizing lithium-ion batteries (LIB) to store and discharge electricity. The plant's storage capacity is 50 MWh, providing a duration of 1 hour at full power. The primary fuel type is listed as "MWH," indicating that the plant stores electricity rather than consuming a traditional fuel source.
The facility operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, which falls under the Texas Reliability Entity (TRE) NERC region. As of the latest rankings, TX11 Republic Road Storage is the 235th largest power plant in Texas out of 313, and the 614th largest in the United States out of 1205.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
−383 MWh
Net Charging
-4.6K MWh
Annual Net Energy
-1.1%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Hearne Substation · 138 kV
Substation Distance
0 km
Operator
Brazos Electric
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
RPUBRDS_RN
Pricing Hub
HB_NORTH
Secondary Zone
LZ_NORTH
Location Type
Resource Node
Node Source
Curated node match
West Michigan residents rally against controversial ‘Project BESS’ battery facility
A company called Key Capture Energy is proposing to build a 100-megawatt battery energy storage complex in Ottawa County.
5 takeaways from Ottawa County’s 100-megawatt battery storage project
New York-based energy storage company Key Capture Energy is in the early stages of planning a battery storage facility in Blendon Township...
5 takeaways from Ottawa County’s 100-megawatt battery storage project
New York-based energy storage company Key Capture Energy is in the early stages of planning a battery storage facility in Blendon Township...
Key Capture Energy completes ITC transfer and construction on two 100MW Texas BESS projects
US battery storage developer Key Capture Energy (KCE) has begun commercial operations for two 100MW battery energy storage system (BESS) projects in Texas.
Last updated 2026-03-26
View all 10 articles