3 MW BESS under construction in Merced, CA — California Independent System Operator
3 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
—
Operating Since
Coordinates
36.9894, -120.8775
County
Merced, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | ZGlobal Inc | — | — |
| Owner(s) | Apex Energy Solutions LLC | — | — |
| Status | Under construction | — | — |
Merced BESS is a 3 MW battery energy storage system located in Merced County, California. The plant, identified by the EIA plant code 68018, is owned and operated by ZGlobal Inc. It consists of a single generator powered by electricity (MWH) stored in batteries.
The facility operates within the California Independent System Operator (CAISO) balancing authority area and the Western Electricity Coordinating Council (WECC) NERC region. Merced BESS ranks as the 250th largest power plant in California out of approximately 300 facilities, and it holds a national ranking of 1080 out of 1205 plants.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_ZP26_GEN-APND
Node Source
OSM spatial match