3 MW BESS planned in San Diego, CA — California Independent System Operator
3 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
Planned: —
Planned Operation
Coordinates
32.8042, -116.9255
County
San Diego, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | EnerSmart Storage | — | — |
| Owner(s) | EnerSmart Storage | — | — |
| Status | Planned | — | — |
The EnerSmart El Cajon BESS is a 3 MW battery energy storage system located in San Diego County, California. The plant, identified by the EIA plant code 66754, is owned and operated by EnerSmart Storage. It consists of a single generator utilizing battery technology and is fueled by electricity (MWH).
The facility operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. EnerSmart El Cajon BESS is ranked as the 244th largest power plant in California out of 300, and nationally it holds a rank of 1071 out of 1205.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Granite Hills Substation · 69 kV
Substation Distance
0.066 km
Operator
San Diego Gas & Electric
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
GRNITE_7_N002
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match