800 MW Batteries (400 MW) + Solar Photovoltaic (400 MW) planned in Henderson, TX — Electric Reliability Council of Texas, Inc.
800 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
32.1115, -95.9614
County
Henderson, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | 210MS 8me, LLC | — | — |
| Owner(s) | 210MS 8me, LLC | — | — |
| Status | Planned | announced | — |
Brittlebush Solar and Battery Storage is a hybrid power plant located in Henderson County, Texas. The facility has a total capacity of 800 MW and is operated by 210MS 8me, LLC. The plant utilizes both solar photovoltaic technology and batteries for energy storage, with two generators on site. Its primary fuel source is electricity (MWH).
The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region. Brittlebush is a significant power producer in Texas, ranking as the 8th largest out of 224 plants in the state, and 21st nationally out of 514 plants. The solar component of the plant uses a fixed tilt tracking system.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
345 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
Projects
With more than two decades of experience in the renewable energy sector, we are committed to building a resilient energy future and creating lasting impact...
Together in Electric Dreams - For Tech Giants, Powering Data Centers is Not All About Natural Gas
Tech giants such as Google, Amazon and Meta have long sought to meet their data-center power needs while at least limiting their greenhouse...
Arizona Powers Ahead With 200 MW Tesla Battery Storage Project
Arizona is taking a significant step toward a sustainable energy future with the development of a 200 megawatt (MW) Tesla Battery Energy Storage System (BESS).
SRP and EDP Renewables Announce New Energy Storage System to Support Increasing Energy Demand
The Flatland Energy Storage Project will be a 200 MW/800 megawatt-hour battery energy storage system located near Coolidge, Arizona.
Last updated 2026-03-14
View all 10 articles