1 MW Solar operating in Essex, NJ — PJM Interconnection, LLC
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
40.6840, -74.1910
County
Essex, NJ
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SoCore Energy LLC | — | — |
| Owner(s) | SoCore Energy LLC | — | — |
| Status | Operating | operating | — |
The NJ Airport Solar Project B is a 1 MW solar photovoltaic power plant located in Essex County, New Jersey. The plant began operating in 2023 and has one generator. It is owned and operated by SoCore Energy LLC. The plant's primary fuel source is solar energy.
The NJ Airport Solar Project B operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. In its latest year of generation data, the plant produced 1,421 MWh of electricity, achieving a capacity factor of 16.2%. The solar array uses a fixed tilt configuration. The plant is ranked as the 301st largest in New Jersey out of 328 plants, and 6471st nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
0.48 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
65 MWh
Latest Month
1.4K MWh
Annual Generation
16.2%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Newark Airport Substation · 345 kV
Substation Distance
0.238 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
NWRKARPT26 KV T1
Pricing Hub
WESTERN HUB
Location Type
Load Node
Node Source
Curated node match