2 MW Solar under construction in Livingston, IL — PJM Interconnection, LLC
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
—
Operating Since
Coordinates
40.8563, -88.6015
County
Livingston, IL
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Clean Energy | AES Clean Energy | — |
| Owner(s) | AES Clean Energy | AES Clean Energy | — |
| Status | Under construction | operating | — |
GEM identifies the owner as AES Clean Energy
This entity is not yet in the GEM ownership database — chain unavailable.
Vermilion Solar II LLC is a 2 MW solar photovoltaic power plant located in Livingston County, Illinois. The plant, identified by plant code 67715, utilizes a single generator and fixed-tilt solar tracking technology. The primary fuel source is solar energy (SUN). AES Clean Energy is the operator of the facility.
The plant operates within the PJM Interconnection, LLC balancing authority, which is part of the Midwest Reliability Organization (MRO) NERC region. In terms of size, Vermilion Solar II ranks as the 162nd largest solar plant in Illinois out of 320, and nationally it is ranked 4847 out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
34.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Pontiac Midpoint Substation · 345 kV
Substation Distance
1.563 km
Operator
Commonwealth Edison
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
80 PONTI138 KV LOADTR76
Pricing Hub
N ILLINOIS HUB
Location Type
Load Node
Node Source
Curated node match