2 MW Solar operating in Livingston, IL — PJM Interconnection, LLC
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
40.9180, -88.6190
County
Livingston, IL
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Solar DG IL 3 LLC | — | — |
| Owner(s) | Solar DG IL 3 LLC | — | — |
| Status | Operating | operating | — |
Pontiac 1A is a 2 MW solar photovoltaic power plant located in Livingston County, Illinois. The plant, which began operating in 2024, has a single generator and utilizes single-axis solar tracking technology. It is owned and operated by Solar DG IL 3 LLC. The plant's primary fuel source is solar energy (SUN).
In its most recent year of operation, Pontiac 1A generated 1,263 MWh of electricity, achieving a capacity factor of 7.1%. The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. In terms of size, Pontiac 1A ranks as the 177th largest solar plant in Illinois out of 320, and 5109th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
40 MWh
Latest Month
1.3K MWh
Annual Generation
7.1%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
N ILLINOIS HUB
Node Source
OSM spatial match