245 MW Solar planned in Bosque, TX — Electric Reliability Council of Texas, Inc.
245 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Coordinates
31.8986, -97.4665
County
Bosque, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cypress Creek Renewables | Cypress Creek Renewables | — |
| Owner(s) | Cypress Creek Renewables | Cypress Creek Renewables | — |
| Status | Planned | pre-construction | — |
GEM identifies the owner as Cypress Creek Renewables
This entity is not yet in the GEM ownership database — chain unavailable.
The Langer solar power plant is located in Bosque County, Texas. The plant has a total capacity of 245 MW and consists of a single generator utilizing solar photovoltaic technology. The primary fuel source is solar energy. The plant is owned and operated by Cypress Creek Renewables.
Langer operates within the Electric Reliability Council of Texas (ERCOT) balancing authority. The plant's solar panels use a fixed-tilt tracking system. Langer ranks as the 71st largest power plant in Texas out of 192, and 157th nationally out of 639 plants.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
345 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Langer SolarERCOT-23INR0030
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Powell Substation · 69 kV
Substation Distance
< 10 km
Operator
Brazos Electric
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
Last updated 2026-03-14
View all 10 articles