1.9 MW Solar operating in Lake, FL — Duke Energy Florida Inc
1.9 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
28.7940, -81.6231
County
Lake, FL
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Green Street Power Partners | Green Street Power Partners | — |
| Owner(s) | Green Street Power Partners | Green Street Power Partners | — |
| Status | Operating | operating | — |
GEM identifies the owner as Green Street Power Partners
This entity is not yet in the GEM ownership database — chain unavailable.
Mount Dora Solar Farm W is a 1.9 MW solar photovoltaic power plant located in Lake County, Florida. The plant began operating in 2023 and is owned and operated by Green Street Power Partners. It utilizes a single-axis tracking system to maximize solar energy capture. The plant is interconnected to the Duke Energy Florida Inc balancing authority within the SERC NERC region.
In its most recent year of operation, Mount Dora Solar Farm W generated 3,633 MWh of electricity, achieving a capacity factor of 21.8%. The plant is fueled by solar energy (SUN). Mount Dora Solar Farm W ranks as the 211th largest solar plant in Florida out of 227, and 5402nd nationally out of 7108. The plant consists of one generator.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Duke Energy Florida Inc
Grid Voltage
13.2 kV
Regulatory Status
NR
Entity Type
Commercial
Sector
IPP Non-CHP
208 MWh
Latest Month
3.6K MWh
Annual Generation
21.8%
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.