2.1 MW Solar operating in Lake, FL — Duke Energy Florida Inc
2.1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
28.7949, -81.6237
County
Lake, FL
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Green Street Power Partners | Green Street Power Partners | — |
| Owner(s) | Green Street Power Partners | Green Street Power Partners | — |
| Status | Operating | operating | — |
GEM identifies the owner as Green Street Power Partners
This entity is not yet in the GEM ownership database — chain unavailable.
Mount Dora Solar Farm F is a 2.1 MW solar photovoltaic power plant located in Lake County, Florida. The plant began operating in 2023 and is owned and operated by Green Street Power Partners. It utilizes a single-axis tracking system to maximize solar energy capture. The plant is interconnected to the Duke Energy Florida Inc balancing authority within the SERC NERC region.
In its most recent year of operation, Mount Dora Solar Farm F generated 4,574 MWh of electricity, achieving a capacity factor of 24.8%. Based on total capacity, the plant ranks as the 210th largest solar facility in Florida out of 227, and 4532nd nationally out of 7108. The plant consists of a single generator using SUN as its primary fuel source.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Duke Energy Florida Inc
Grid Voltage
13.2 kV
Regulatory Status
NR
Entity Type
Commercial
Sector
IPP Non-CHP
266 MWh
Latest Month
4.6K MWh
Annual Generation
24.8%
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.