2 MW Solar operating in Orange, NY — New York Independent System Operator
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
41.3380, -74.4810
County
Orange, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Lower Road II, LLC | — | — |
| Owner(s) | Lower Road II, LLC | — | — |
| Status | Operating | operating | — |
NY Lower Road II CSG is a 2 MW solar photovoltaic power plant located in Orange County, New York. The plant began operating in 2023 and has a single generator. It is owned and operated by Lower Road II, LLC. The plant utilizes single-axis tracking technology to maximize solar energy capture.
In its most recent year of operation, NY Lower Road II CSG generated 2,997 MWh of electricity, achieving a capacity factor of 17.1%. The plant is connected to the New York Independent System Operator (NYISO) balancing authority and is within the Northeast Power Coordinating Council (NPCC) NERC region. In terms of size, the plant is ranked 541 out of 695 power plants in New York state, and 5011 out of 7108 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
New York Independent System Operator
Grid Voltage
13.2 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
181 MWh
Latest Month
3.0K MWh
Annual Generation
17.1%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
CPV_VALLEY___CC1
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone G
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.